摘 要
近年来,随着我国的钢铁企业高炉的大型化、高压化的迅速发展,钟式炉顶的旋转布料器的环式布料转化为无料钟炉顶的旋转溜槽布料。而实现这一目标的前提就是高炉工长要实时准确的掌握矿石和焦炭在每一批的布料情况,这就使高炉布料模型的设计及实现成为可能。基于OPC通讯的高炉布料模型设计及实现是在安钢2200m3高炉全部PLC自动控制系统投产后,根据高炉的布料规律,为了更好地改善高炉炉况,实现准确高质量的精操作而提出的。
在综合当前过程控制系统的开发和研究的基础上,针对布料模型设计进行深入研究,对目前的国内外钢铁企业炼铁操作的发展概况进行分析,提出进行布料模型设计的必要性,并以安钢炼铁厂2200m3高炉布料模型设计为例,结合其一级基础自动化系统的设计情况,提出了具有多种优势的三层C/S模式的二级过程计算机系统的构架设计,采用OPC通讯方式进行布料模型的设计的开发策略,并依据解决策略,以相关技术基础的介绍,采用结构化方法进行布料模型的需求分析及设计,应用可视化工具与基于控件的方法实现人机界面的设计。
安钢2200m3高炉布料模型软件系统的设计及实现过程,为系统提供良好的系统架构,数据采集并及处理符合控制应用要求,设计布料模型对高炉操作具有一定的指导意义。
关键词:高炉布料模型 基于OPC通讯方式 设计及实现
Abstract
In recent years, with the develop of the Blast Furnace (BF) becoming greatness and high-pressure, the circling distributor of bell roof has been replaced with the circumrotating distributor of bell-less roof. But the key to realize the goal is mastering the complexion of coke and ore really and make it possible to design and implement of the BF distributing model. The design and implement of the BF distributing model based on OPC mode has been put forward in order to realize better operation and better furnace condition with the distributing rule after the PLC automation control system of AnGang 2200m3 BF.
Associating with the development and research of process control system now, aiming at deeply research of BF distributing model and analyzing the develop general situation of Iron & Steel enterprises in our country or outside now, a model has been put forward. A three-layer C/S mode truss of L2 process computer system design based on develop strategy of OPC communication mode was put forward associating the design of L1 base automation system with the sample of 2200m3 BF distributing model of AnGang Iron Making Factory and develop the interface base on the strategy and related techniques with Structured Analyze and design, visible programme tools and component technique.
The software design and implement of 2200m3 BF distributing model of AnGang offered the system a good structure with the software engineering ideas, the data collection and disposal accords the control application and the model is provided with great guidance significance and has the worth of application in practice.
Key words:BF distributing model based on OPC mode design and implement
目 录
摘 要 I
ABSTRACT II
目 录 III
1 绪论 1
1.1 课题的研究背景 1
1.2 课题的研究目的和意义 3
1.3 国内外研究概况 5
1.4 论文的主要研究内容 6
2 基本技术与理论 7
2.1 C/S架构基本概念 7
2.2 OPC技术 8
2.3 无钟炉顶高炉布料工艺 14
2.4 本章小结 17
3 基于OPC通讯的高炉布料模型分析与设计 18
3.1 可行性研究 18
3.2 需求分析 19
3.3 系统网络架构设计 25
3.4 布料模型系统设计 27
3.5 本章小结 41
4 布料模型的实现 42
4.1 硬件实现平台 42
4.2 软件实现平台 43
4.3 布料模型一级机数据通讯模块实现 44
4.4 布料模型人机界面实现 51
4.5 本章总结 54
5 全文总结 55
5.1 全文总结 55
5.2 展望 56
致 谢 57
参考文献 58
1 绪论
2005年10月,安阳钢铁公司炼铁厂第一座2200m3高炉建立成投产,对于安阳钢铁公司来说,这是一个新的尝试,因为在以前的几十年中,一直从事小高炉钟式炉顶操作的炼铁人,将要以一种新的操作手段去面对无钟炉顶的大高炉新工艺了。面对新的布料设备,新的布料方式,如何使工长更直观地了解到炉内的布料情况,更好地掌握炉内的料面情况,成为一个急需解决问题。
1.1 课题的研究背景

您当前的位置:
